It’s Day 6 of Newport, and I’m at a solid six inches, which I think says fairly certainly that I won’t finish the sweater in two weeks, or even in February. The banging crew mostly have both sleeves of their sweater done with 12″ or so of the body.

No matter. I am doing a good two hours’ worth of knitting a day, ands I suppose I will finish the sweater in my usual six weeks, or maybe a bit faster. I think I’ll need to stop and finish the mittens anyway to avoid guilt.

I did some whining at this point, but I have removed it.